Institutional
| Project: |
Room C185 Wet Lab Renovation |
| | Client: | Vakerie McKenzie |
| | Client Rep: | John Chavez (303) 735-5192 |
| | Description: | Remodel of existing lab space into a wet lab environment. Update finishes, add chemical resistant millwork, install 4' fume hood, upgrade to energy efficient lighting and partition a private office. |
| | Budget/Schedule: | $150,000/ August 2009 |
| | General Contractor: | TBD |
| Project: |
UMC WINDOW REPLACEMENT |
| | Client: | University Memorial Center |
| | | 1669 Euclid Ave., Boulder, CO 80309 |
| | Client Rep: | Jim Wollum (303) 757-4953 |
| | Description: | Replace existing exterior windows on several elevations adjacent to the main entry on Euclid Avenue. |
| | Budget/Schedule: | TBD |
| | General Contractor: | TBD |
|
Project: |
ECSL 1B36 FUME HOOD REPLACEMENT |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. John Chavez (303) 735-5192 |
| |
Description: |
Replace old counter-mounted fume hood with new full-height wider hood. Modify existing millwork for new hood, tie new utilities into existing lines. |
| |
Budget/Schedule: |
$35,000/ Completed July 2008. |
| |
General Contractor: |
Trinity Mechanical, Inc. |
| Project: |
Darley Hall - Gender Neutral |
| | Client: | Housing and Dining of University of Colorado at Boulder |
| | | 26 Hallet Hall, 154 UCB, Boulder, CO80309-0154 |
| | Client Rep: | Juergen Friese (303) 492-0390 |
| | Description: | Remodel existing men's restroom from 4 occupants to create 2 smaller single occupancy restrooms, one restroom to be an all gender fully ADA accessible restroom. |
| | Budget/Schedule: | $38,000/ May 2008 |
| | General Contractor: | IBEC Construction Co. |
| Project: |
Darley Commons - Mail Room |
| | Client: | Housing and Dining of University of Colorado at Boulder |
| | | 26 Hallet Hall, 154 UCB, Boulder, CO80309-0154 |
| | Client Rep: | Sheri Lakshmi |
| | Description: | Remodel existing mail room to accommodate more mail boxes, shelving units, replace interior finishes and provide increased level in fire protection. |
| | Budget/Schedule: | $55,000/ August 2008 |
| | General Contractor: | UCB In-House Contruction Staff. |
| Project: |
Darley Hall ADA Improvements Project |
| | Client: | Housing and Dining of University of Colorado at Boulder |
| | | 26 Hallet Hall, 154 UCB, Boulder, CO80309-0154 |
| | Client Rep: | Juergen Friese (303) 492-0390 |
| | Description: | Remodel an existing building to provide an ADA compliant path of travel from the main floor to the basement. Improvements include accessible doorways w/ card access, modernization of elevator cab and controls, light switch relocation and path of travel hallway improvements. |
| | Budget/Schedule: |
$20,000/ August 2008 - $110,000/ August 2008 |
| | General Contractor: | UCB In-House Contruction Staff - Elevators Unlimited |
| Project: |
University Club - Box Offices |
| | Client: | Joan McLean Braun - Exec. Director Concert and Public Relations |
| | | Imig Music C101 - 301 UCB - Boulder, CO 80309-0301 |
| | Client Rep: | Jim Wollum (303) 757-4953 |
| | Description: | Remodel of existing interior spaces to accommodate new box offices. Scope to include new interior finishes and the installation of a new air conditioning units. |
| | Budget/Schedule: | $50,000/ December 2008 |
| | General Contractor: | RMA Construction |
| Project: |
Meat Shop Cooler Project |
| | Client: | Housing and Dining of University of Colorado at Boulder |
| | | 26 Hallet Hall, 154 UCB, Boulder, CO 80309-0154 |
| | Client Rep: | Juergen Friese (303) 492-0309 |
| | Description: |
Expand existing walk-in cooler by 200 SF. Install new 15’ height, 680SF, -10 freezer in existing warehouse. Design thermal protected concrete floor for freezer sufficient for forklift equipment. |
| | Budget/Schedule: | $220,000/ November 2007 |
| | General Contractor: | Kirsche Construction |
|
Project: |
JILA MICROBIOLOGY LABS |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Bill Williams (303) 492-4739 |
| |
Description: |
1,215 S.F. new research laboratories including electron microscope “clean room”. |
| |
Budget/Schedule: |
$175,000/ Completed March 2002. |
| |
General Contractor: |
Barba & Sons |
|
Project: |
FRONT RANGE COMMUNITY COLLEGE CENTRAL PLANT |
| |
Client: |
Front Range Community College |
| |
|
4616 S. Shields, Fort Collins, CO 80526-3812 |
| |
Client Rep: |
Mr. Dennis DeRemer (970) 204-8255 |
| |
Description: |
Site planning & design services for for new buildings to contain the department of facilities management and a new central heat plant…as well as the integration of utility piping throughout the Larimer campus. |
| |
Budget/Schedule: |
$180,000/Completed May 2002. |
| |
General Contractor: |
Fischer Construction Co. |
|
Project: |
UNIVERSITY CLUB |
| |
Client: |
The Regents of the University of Colorador |
| |
|
Alumni Association Boulder CO 80302 |
| |
Client Rep: |
Mr. Kent Zimmerman (303) 492-8484 |
| |
Description: |
A two story addition totaling 5,612 SF of new event space and 2,367 SF of courtyard to the existing University Club - includes a welcome drop-off area, site and ADA upgrades. |
| |
Budget/Schedule: |
$850,000/Estimated August 2002. |
| |
General Contractor: |
TBD |
|
Project: |
CU PLANNING OFFICES |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Bill Sweeney (303) 735-1412 |
| |
Description: |
600 SF tenant finish including new kitchen and casework, custom millwork and new finishes. |
| |
Budget/Schedule: |
$15,000/Completed February 2001. |
| |
General Contractor: |
Sun Construction and Design Services, Inc. |
|
Project: |
RESEARCH SEMINAR LABORATORY |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. James Hill (303) 492-4225/Mr. Steve Carr (303) 492-5874 |
| |
Description: |
764 S.F. new laboratory including casework, fumehoods, utilities, and finishes. |
| |
Budget/Schedule: |
$45,000/Completed March 2001. |
| |
General Contractor: |
Sun Construction and Design Services, Inc. |
|
Project: |
BUS TERMINAL FACILITY – NEDERLAND |
| |
Client: |
Boulder Valley School District RE-2 |
| |
|
P.O. Box 9011 Boulder, CO 80301 |
| |
Client Rep: |
Mr. Lou Novak (303) 447-5197 |
| |
Description: |
4 acre bus facility with 3,960 S.F. pre-engineered metal building containing dispatch office and maintenance bays. Site upgrades include domestic water system and firefighting reservoir. |
| |
Budget/Schedule: |
$451,100/Completed April 2001. |
| |
General Contractor: |
Golden Triangle Construction, Inc. |
|
Project: |
BUS GARAGE EXPANSION |
| |
Client: |
Boulder Valley School District RE2 |
| |
|
P.O. Box 9011 Boulder, CO 80301 |
| |
Client Rep: |
Mr. Lou Novak |
| |
Description: |
4.1-acre bus facility including 4,800 SF building containing staff lounge, caretaker’s facility and maintenance bays. |
| |
Budget/Schedule: |
$451,100 / Completed August 2001 |
| |
General Contractor: |
Golden Triangle Construction, Inc. |
|
Project: |
ECCH LABORATORY RENOVATION |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Ms. Kristen Hessen (303) 492-4739 |
| |
Description: |
600 S.F. renovation of chemical engineering laboratory including fumehoods, casework and utilities. |
| |
Budget/Schedule: |
$65,000/Completed September 2001. |
| |
General Contractor: |
Sun Construction and Design Services, Inc. |
|
Project: |
TEM LABORATORY |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. James Hill (303) 492-4225/Mr. Steve Carr (303) 492-5874 |
| |
Description: |
885 S.F. new transmission electron microscope laboratory including casework, fumehood, utilities and finishes. |
| |
Budget/Schedule: |
$174,900/Completed September 2001. |
| |
General Contractor: |
Gerald H. Phipps, Inc. |
|
Project: |
BUS TERMINAL FACILITY – LAFAYETTE |
| |
Client: |
Boulder Valley School District RE-2 |
| |
|
P.O. Box 9011 Boulder, CO 80301 |
| |
Client Rep: |
Mr. Lou Novak (303) 447-5197 |
| |
Description: |
5.9 acre bus facility including 3,960 S.F. pre-engineered metal building containing dispatch office and maintenance bays. |
| |
Budget/Schedule: |
$672,400/Completed January 2000. |
| |
General Contractor: |
KCI Construction, Inc. |
|
Project: |
WINEY LABORATORY |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. James Hill (303) 492-4225/Mr. Steve Carr (303) 492-5874 |
| |
Description: |
2,730 SF renovated molecular laboratories, biology lab to including casework, fumehoods, utilities, and life safety upgrades. |
| |
Budget/Schedule: |
$248,000/Estimated May 2000. |
| |
General Contractor: |
To be determined. |
|
Project: |
MCDB LABORATORY |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. James Hill (303) 492-4225/Mr. Steve Carr (303) 492-5874 |
| |
Description: |
3,120 S.F. new laboratories including casework, fumehoods, utilities, and hallway finishes. |
| |
Budget/Schedule: |
$485,000/Completed August 2000. |
| |
General Contractor: |
Sun Construction and Design Services, Inc. |
|
Project: |
EISENHOWER AND HEATHERWOOD ELEMENTARY SCHOOLS BOND PROJECT 1999 |
| |
Client: |
Boulder Valley School District RE-2 |
| |
|
P.O. Box 9011 Boulder, CO 80301 |
| |
Client Rep: |
Mr. John Bollinger (303) 447-5113 |
| |
Description: |
Gymnasium addition, ADA and life safety upgrades, new rooftop mechanical systems. |
| |
Budget/Schedule: |
$1.3 Million/Completed August 2000. |
| |
General Contractor: |
Fischer Construction Co., Inc. |
|
Project: |
CHILLER @ ESC- BOULDER |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Chuck Geiss/Mr. Mike Martens (303) 492-5000 |
| |
Description: |
Replacement of central chiller plant including chiller and cooling towers. |
| |
Budget/Schedule: |
$1.5 Million/Completed March 1999. |
| |
General Contractor: |
U.S. Engineering |
|
Project: |
FAIRVIEW HIGH SCHOOL – MUSIC DEPARTMENT |
| |
Client: |
Boulder Valley School District RE-2 |
| |
|
P.O. Box 9011 Boulder, CO 80301 |
| |
Client Rep: |
Mr. Dave Compton |
| |
Description: |
Renovated band instrument storage facility to include new casework/lockers for security. Site plan and coordination of storage building adjacent to football field. |
| |
Budget/Schedule: |
$30,500/Completed July 1999. |
| |
General Contractor: |
Sun Construction and Design Services, Inc. |
|
Project: |
RL4 MECHANICAL ROOM |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Tim Mangina (303) 492-2211 |
| |
Description: |
400 S.F. addition of mechanical room to enclose existing chiller units.
|
| |
Budget/Schedule: |
$60,000/Completed January 1998. |
| |
General Contractor: |
Sun Construction and Design Services, Inc. |
|
Project: |
FAIRVIEW HIGH SCHOOL – COURTYARD ENTRY |
| |
Client: |
Boulder Valley School District RE-2 |
| |
|
P.O. Box 9011 Boulder, CO 80301 |
| |
Client Rep: |
Principal Dennis Dee |
| |
Description: |
Conceptual planning for a renovation to the student/staff main building entrance. Development of interim solutions for PTO funding while waiting for bond financing. |
| |
Budget/Schedule: |
$24,000/Completed August 1998. |
| |
General Contractor: |
BVSD personnel and parent volunteers. |
|
Project: |
FACMAN RECEPTION AREA |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Tim Mangina (303) 492-1450 |
| |
Description: |
600 SF renovation to existing reception area, including Director’s Office.
Interior design included furniture and fabric selections.
|
| |
Budget/Schedule: |
$95,000/Completed June 1998. |
| |
General Contractor: |
M. Verplank- Facilities Management |
|
Project: |
2ND FLOOR WEST COMPUTING CENTER |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Jim Hill (303) 492-4225 |
| |
Description: |
4,450 SF renovation and addition to existing campus computer facility. |
| |
Budget/Schedule: |
$422,850/Completed July 1998. |
| |
General Contractor: |
J.C. Brooks and Company, Inc. |
|
Project: |
AEROSPACE RENOVATIONS |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Don Johnson/Mr. Robert Culp (303) 492-7974 |
| |
Description: |
Renovations of various offices, laboratories and conference facilities in the entire wing of the Engineering Center.
|
| |
Budget/Schedule: |
$175,000/Completed September 1998. |
| |
General Contractor: |
Krische Construction Co. Inc. |
|
Project: |
LOCKHEED SMART CLASSROOM |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Don Johnson (303) 492-0750/Mr. Bob Culp (303) 492-7974 |
| |
Description: |
1,000 SF renovation to include leading edge computer teaching technology upgrades and furnishings. |
| |
Budget/Schedule: |
$65,000/Completed November 1998. |
| |
General Contractor: |
Gilmore Construction |
|
Project: |
INTEGRATED TEACHING AND LEARNING LABORATORIES ADMIN OFFICES |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Ms. Jackie Sullivan (303) 492-5067 |
| |
Description: |
750 SF tenant finish including custom built-in furnishings, equipment and fixtures. |
| |
Budget/Schedule: |
$65,000/Completed March 1997. |
| |
General Contractor: |
Sun Construction and Design Services Inc. |
|
Project: |
RL1 MEETING ROOM |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Jim Hill (303) 492-2211 |
| |
Description: |
1,200 SF renovation including audio video upgrades, finishes and mechanical/lighting. |
| |
Budget/Schedule: |
$95,000/Completed April 1997. |
| |
General Contractor: |
Taylor Ball of Colorado, Inc. |
|
Project: |
HUMAN SERVICES @ FACMAN |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Tim Mangina (303) 492-2211 |
| |
Description: |
2,370 SF renovation and 500 SF addition to Folsom Stadium including new offices, shop space and employee lounge. |
| |
Budget/Schedule: |
$305,000/ Completed June 1997. |
| |
General Contractor: |
Sun Construction and Design Services, Inc. |
|
Project: |
ROSS HALL |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Scott Mc Lean (303) 492-5459 |
| |
Description: |
Replacement of old absorption chiller with new air-cooled chiller. |
| |
Budget/Schedule: |
$250,000/Completed June 1997. |
| |
General Contractor: |
Midlands Mechanical |
|
Project: |
MIN HAN LAB - PHASE 1 AND PHASE 2 |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. James Hill (303) 492-4225/Mr. Steve Carr (303) 492-5874 |
| |
Description: |
3,180 SF renovation of Molecular Biology Laboratory including new casework, workstations and life safety upgrades. |
| |
Budget/Schedule: |
$320,000/Completed June 1997. |
| |
General Contractor: |
Krische Construction Co. Inc. |
|
Project: |
MAPLETON ELEMENTARY SCHOOL |
| |
Client: |
Boulder Valley School District RE-2 |
| |
|
P.O. Box 9011 Boulder, CO 80301 |
| |
Client Rep: |
Mr. Dale Hobbs |
| |
Description: |
Modifications to walkways and installation of upgraded site electrical equipment. |
| |
Budget/Schedule: |
$48,000/ Completed August 1997. |
| |
General Contractor: |
Turnquist Construction Co. |
|
Project: |
CHILLER ADDITION - UNIVERSITY OF NORTHERN COLORADO |
| |
Client: |
University of Northern Colorado |
| |
|
Department of Facilities Services Greeley, CO 80639 |
| |
Client Rep: |
Mr. Ron Grey (303) 351-1981 |
| |
Description: |
600 SF freestanding building to contain new mechanical equipment, including site access and parking renovations. |
| |
Budget/Schedule: |
$350,000/ Completed April 1996. |
| |
General Contractor: |
Sun Construction and Design Services Inc. |
|
Project: |
ARMORY BUILDING |
| |
Client: |
University of Northern Colorado |
| |
|
Department of Facilities Services Greeley, CO 80639 |
| |
Client Rep: |
Mr. Andy Holst (303) 492-3464 |
| |
Description: |
Retrofit of mechanical systems for the building, including issues related to historic detailing, building code and cost control. |
| |
Budget/Schedule: |
$230,000/ Completed July 1996. |
| |
General Contractor: |
Golden Triangle Construction Co. |
|
Project: |
UMC 18 and 19 |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder CO 80309-0053 |
| |
Client Rep: |
Mr. Jim Hill (303) 492-4225/Mr. JC Ancel (303) 492-8832 |
| |
Description: |
500 SF renovation of existing restrooms to provide access to disabled persons per ADA requirements, including a separate restroom for the disabled. |
| |
Budget/Schedule: |
$62,900/Completed August 1996. |
| |
General Contractor: |
Westland Mechanical Inc. |
|
Project: |
FIELDHOUSE ACCESSIBILITY STUDY |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder CO 80309-0053 |
| |
Client Rep: |
Mr. Gil Fike (303) 492-1431/Mr. John Krueger (303) 492-1594 |
| |
Description: |
Providing accessibility for disabled to upper levels of Balch Fieldhouse
and the 4 story Stadium Press Box, including ADA requirements.
|
| |
Budget/Schedule: |
Feasibility Complete. |
|
Project: |
WASHINGTON ELEMENTARY SCHOOL |
| |
Client: |
Boulder Valley School District RE-2 |
| |
|
P.O. Box 9011 Boulder, CO 80301 |
| |
Client Rep: |
Mr. George Galida |
| |
Description: |
Coordination of multiple mini-projects including window replacement, structural repair for ADA and general-purpose room remodel. |
| |
Budget/Schedule: |
$165,000/ Completed October 1996. |
| |
General Contractor: |
Turnquist Construction Co. |
|
Project: |
REAL McCOY CAFETERIA |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Donald Johnson (303) 492-0750/Mr. Dan Farrell (303) 492-6284 |
| |
Description: |
3,100 SF renovation for new short order kitchen and food service facility, including dining room, vending area, and accessibility upgrades. |
| |
Budget/Schedule: |
$185,000/Completed February 1995. |
| |
General Contractor: |
Hughes-Groesch Construction |
|
Project: |
ARMORY BUILDING |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Mike Barden (303) 492-3500 |
| |
Description: |
Retrofit of mechanical system including issue relating to continuance of occupancy during construction, historic detailing, building code upgrades and cost control techniques. |
| |
Budget/Schedule: |
$230,000/Completed September 1995. |
| |
General Contractor: |
Sun Construction and Design Services, Inc. |
|
Project: |
BUS MAINTENANCE FACILITY EXPANSION |
| |
Client: |
Boulder Valley School District RE-2 |
| |
|
P.O. Box 9011 Boulder, CO 80301 |
| |
Client Rep: |
Mr. Dale Hobbs (303) 447-5428 |
| |
Description: |
Addition of 5,500 SF to an existing maintenance facility to accommodate six additional bus bays and a maintenance shop. |
| |
Budget/Schedule: |
$221,000/Completed September 1995. |
| |
General Contractor: |
Golden Triangle Construction Co. |
|
Project: |
HEATHERWOOD ELEMENTARY SCHOOL CLASSROOM RENOVATION |
| |
Client: |
Boulder Valley School District RE-2 |
| |
|
P.O. Box 9011 Boulder, CO 80301 |
| |
Client Rep: |
Mr. George Galida (303) 447-5428 |
| |
Description: |
Complete open space renovations to include new light monitors, operable partitions and acoustical paneling for noise control. |
| |
Budget/Schedule: |
$228,000/Completed October 1995. |
| |
General Contractor: |
Long Construction Co. Inc. |
|
Project: |
EISENHOWER and HEATHERWOOD ELEMENTARY SCHOOLS OPEN SPACE RENOVATION |
| |
Client: |
Boulder Valley School District RE-2 |
| |
|
P.O. Box 9011 Boulder, CO 80301 |
| |
Client Rep: |
Mr. George Galida (303) 447-5428 |
| |
Description: |
Remodel 20,000 SF in each school of open classroom space to provide acoustical separation, storage, countertops, and movable furniture. |
| |
Budget/Schedule: |
$315,000/ Completed October 1995. |
| |
General Contractor: |
Long Construction Co., Inc. |
|
Project: |
KARL LARSON BUILDING SYSTEMS LAB |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert H. Stolte (303) 492-1423/Dr. Jan Kreider (303) 492-3915 |
| |
Description: |
2,400 SF addition and 3,200 SF renovation to existing rooftop facility in Civil Engineering. Includes laboratories, student classrooms and offices. |
| |
Budget/Schedule: |
$525,000/Completed January 1994. |
| |
General Contractor: |
J.C. Brooks and Co. Inc. |
|
Project: |
GLASSWARE/ MEDIAWARE |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Mark Spiegel (303) 492-4303/ Mr. Abe Flexor (303) 492-7990 |
| |
Description: |
Renovation of four Glassware/Mediaware preparatory kitchens of approximately 312 SF each to include distilled water source, wash racks, specimen food preparation and work areas. |
| |
Budget/Schedule: |
$135,000/Completed February 1994 |
| |
General Contractor: |
Sun Construction and Design Services, Inc. |
|
Project: |
UMC ACCESSIBILITY LEVEL 2 |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Mike Barden (303) 492-3500/Mr. JC Ancel (303) 492-8832 |
| |
Description: |
1,000 SF renovation of existing restrooms to provide access to disabled persons per ADA. Includes new finishes, lighting and mechanical. |
| |
Budget/Schedule: |
$75,000/Completed November 1994. |
| |
General Contractor: |
Hughes Groesch Construction Co. |
|
Project: |
MEN’S BASKETBALL |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Gil Fike (303) 492-1431/ Mr. John Krueger (303) 492-1594 |
| |
Description: |
2,040 SF renovation of existing stadium space to include coach’s offices, administrative area and players lounge for film viewing and snack bar. |
| |
Budget/Schedule: |
$125,000/ Completed February 1993. |
| |
General Contractor: |
Taylor Ball of Colorado, Inc. |
|
Project: |
DEPARTMENT OF COMMUNICATIONS |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Erik van de Boogaard (303) 492-4225/ |
| |
Description: |
14,200 SF renovation and upgrade of century-old building to modern, 1st class office and meeting spaces, life safety analysis, and furnishing plan. |
| |
Budget/Schedule: |
$174,500/Completed February 1993. |
| |
General Contractor: |
Taylor Ball of Colorado, Inc. |
|
Project: |
GAMOW LAB |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert H. Stolte (303) 492-1423/Dr. Robert Culp (303) 492-7974 |
| |
Description: |
1,100 SF renovation of outdated lab to include raised access floor, vibration isolation equipment, laser requirements. |
| |
Budget/Schedule: |
$85,000/Completed February 1993. |
| |
General Contractor: |
Gardner Co. Inc. |
|
Project: |
BUSINESS TICKET OFFICE |
| |
Client: |
University of Northern Colorado |
| |
|
Facilities Management Greeley, CO 80639 |
| |
Client Rep: |
Mr. Gil Fike (303) 492-1431/Mr. John Krueger (303) 492-1594 |
| |
Description: |
4200 renovation of existing ticket sales offices to include new public ticket lobby and built-ins, open plan furniture, communication system upgrades. |
| |
Budget/Schedule: |
$175,000/Completed August 1993. |
| |
General Contractor: |
Valle del Rio Co. Inc. |
|
Project: |
STUDENT UNION MECHANICAL RETROFIT |
| |
Client: |
University of Northern Colorado |
| |
|
Facilities Management Greeley, CO 80639 |
| |
Client Rep: |
Mr. Norm Lawrence (303) 351-1981/Mr. Paul Seward (303) 239-8700 |
| |
Description: |
1,200 SF chilled water plant building including associated renovations to existing boiler room and distribution systems. Utilized existing architectural details. |
| |
Budget/Schedule: |
$650,000/Completed August 1993. |
| |
General Contractor: |
Sun Construction and Design Services, Inc. |
|
Project: |
VISUALIZATION LAB |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert H. Stolte (303) 492-1423/Dr. Carlos Felippa (303) 492-6547 |
| |
Description: |
650 SF renovation of outdated lab to include laser technology and updated equipment. |
| |
Budget/Schedule: |
$34,000/Completed September 1993. |
| |
General Contractor: |
Sun Construction and Design Services, Inc. |
|
Project: |
FRESHMAN DESIGN STUDIO |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert H. Stolte (303) 492-1423/Mr. Larry Carlson (303) 492-3675 |
| |
Description: |
2050 SF renovation of classroom into high end computer classroom to include operable partition, CAD stations and media center, interior furnishing. |
| |
Budget/Schedule: |
$180,000/Completed October 1993. |
| |
General Contractor: |
Maxwells Construction Co |
|
Project: |
UMC BOOK CENTER |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Erik van de Boogaard (303) 492-4225
Mr. Dennis Berry (303) 492-6411
|
| |
Description: |
15,600 SF renovation and refixturing to University Book Center with new interiors,fire and stairway protection, asbestos abatement and new furnishings package. |
| |
Budget/Schedule: |
$760,000/Completed September 1993. |
| |
General Contractor: |
Valle del Rio Co. Inc. |
|
Project: |
MEN’S BASKETBALL |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423/Mr. Tom Lemieux (303) 492-7300 |
| |
Description: |
10,300 SF new facility in CU Research Park. Includes a 1,700 SF headhouse for preparation and potting of plant materials and administrative office, and an 8,600 SF greenhouse with multiple environments. |
| |
Budget/Schedule: |
$1,100,000/Completed November 1993. |
| |
General Contractor: |
J.C. Brooks and Co. Inc. |
|
Project: |
NORLIN CHILLLER FACILITY/PARKING DECK |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Don Milkovich (303) 492-4221/Mr. Paul Seward with EEI (303) 239-8700 |
| |
Description: |
1000 SF basement addition with loading zone on roof. Designed lift-off panels to facilitate future replacement, architectural detailing of historic interiors. |
| |
Budget/Schedule: |
$225,000/Completed November 1993. |
| |
General Contractor: |
Valle del Rio Co. Inc. |
|
Project: |
EPOB GREENHOUSE |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423/Mr. Tom Lemieux (303) 492-7300 |
| |
Description: |
10,300 SF new facility in CU Research Park. Includes a 1,700 SF Headhouse for preparation and potting of plant materials and administrative office, and an 8,600 SF Greenhouse with multiple environments. |
| |
Budget/Schedule: |
$1,100,000/Completed November 1993. |
| |
General Contractor: |
J.C. Brooks and Co. Inc. |
|
Project: |
EATON CONFERENCE SUITE |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423/Dr. Robert Culp (303) 492-7974 |
| |
Description: |
1,200 SF remodel into "state of the art" audio visual conference room with "break-out" room. Includes custom built-in AV spaces, furniture and finishes. |
| |
Budget/Schedule: |
$125,000/Completed February 1992. |
| |
General Contractor: |
J.C. Brooks & Co. Inc. |
|
Project: |
UMC ACCESSIBILITY LEVEL 1 |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Don Milkovich (303) 492-4221/Mr. JC Ancel (303) 492-8832 |
| |
Description: |
1,200 SF renovation of existing restrooms to provide access to disabled persons per ADA requirements. New entrance for bowling alley. |
| |
Budget/Schedule: |
$87,900/Completed August 1992. |
| |
General Contractor: |
Sun Construction and Design Services, Inc. |
|
Project: |
CADSWES |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert H. Stolte (303) 492-1423/Ms. Jackie Sullivan (303) 492-3797 |
| |
Description: |
3660 SF addition of new floor within existing 2 story space. New offices and computer rooms. Fluid dynamics laboratory on 1st floor below. |
| |
Budget/Schedule: |
$380,000/Completed November 1992. |
| |
General Contractor: |
Taylor Ball of Colorado, Inc. |
|
Project: |
STRUCTURAL DYNAMICS AND CONTROL LAB |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert H. Stolte (303) 492-1423/Dr. Robert Culp (303) 492-7974 |
| |
Description: |
3200 SF addition of new floor within existing 2 story space. New offices and graduate student spaces. Space experiment laboratory on 1st floor below. |
| |
Budget/Schedule: |
$288,700/Completed December 1992. |
| |
General Contractor: |
Gardner Co. Inc. |
|
Project: |
AEROSPACE ENGINEERING ADDITION |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423/Dr. Robert Culp (303) 492-7974 |
| |
Description: |
Phase 1: 3,200 SF addition of new floor within existing 2-story space. New offices and teaching areas. Fire and building code updates. Phase 2: 3,200 SF renovation. |
| |
Budget/Schedule: |
Phase 1-$350,000 - Phase 2-$300,000/Completed December 1991. |
| |
General Contractor: |
Phase 1-Taylor Ball of Colorado, Inc. Phase 2-Breiner Construction Co. Inc. |
|
Project: |
CAPP LAB |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423/Dr. Karl Winklman (303) 492-6380 |
| |
Description: |
2,400 SF remodel of manual drafting classroom into computer automated drafting stations, including support offices and computer rooms. |
| |
Budget/Schedule: |
$95,000/Completed January 1991. |
| |
General Contractor: |
Sun Construction Services, Inc. |
|
Project: |
GROWTH CHAMBERS - RAMALEY BUILDING |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Ms. Kris Hedberg (303) 492-4221/Mr. Russ Monson (303) 492-6319 |
| |
Description: |
700 SF of biology-related controlled environment rooms on an existing roof structure; 3,600 SF of fire code upgrades. |
| |
Budget/Schedule: |
$166,000/Completed January 1991. |
| |
General Contractor: |
Taylor Ball of Colorado, Inc. (Ringland/Johnson/Crowley Inc.) |
|
Project: |
EPOB GREENHOUSE - RAMALEY BIOLOGY BUILDING |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Gil Fike (303) 492-4221 / Mr. Tom Lemieux (303) 492-8981 |
| |
Description: |
2,900 SF research greenhouse added to fourth floor. Includes new elevator/stairwell access and life safety upgrades to adjacent spaces within building. |
| |
Budget/Schedule: |
$725,000/Feasibility Completed January 1991. |
| |
General Contractor: |
N/A |
|
Project: |
FIBER-OPTIC REPEATER STATION |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Donald Milkovich (303) 492-4221/Mr. Larry Warner (303) 492-2935 |
| |
Description: |
150 SF building containing electronic telecommunications equipment for interface with East Campus Research Park. Located in Smiley Court Family Housing Complex. |
| |
Budget/Schedule: |
$40,000/Completed February 1991. |
| |
General Contractor: |
Taylor Ball of Colorado, Inc. (Ringland/Johnson/Crowley Inc.) |
|
Project: |
TELCOM ADDITION |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Erik van de Boogaard (303) 492-4225/ |
| |
Description: |
500 SF addition to existing communication center. Includes raised access floor, and central security system. Clad in sandstone veneer to reflect adjacent materials. |
| |
Budget/Schedule: |
$38,000/Completed February 1991. |
| |
General Contractor: |
Taylor Ball of Colorado, Inc. (Ringland, Johnson, Crowley, Inc.) |
|
Project: |
CASA EXPANSION PROJECT |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Planning Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. William Deno AIA (303) 492-5682/Dr. Robert Stencel (303) 492-4297 |
| |
Description: |
Participation in input gathering, preparation and refinement of Conceptual Design, investigation of Site Alternatives, participation in Program Plan preparation. |
| |
Budget/Schedule: |
Duane Physics addition: 130,00 SF. CASA: 30,000 SF. |
| |
General Contractor: |
Program/concepts complete April 1991. |
|
Project: |
HEALTH AND SAFETY UPGRADES |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. William Deno (303) 492-5682/Dr. George Morganthaler (303) 492-3633 |
| |
Description: |
Review of Engineering Science Center as it pertains to Life Safety Codes. Issues addressed include exiting, chemical storage, fire protection, emergency power and hazardous material storage. |
| |
Size: |
500,000 SF |
| |
Status: |
Program/concepts complete April 1991. |
|
Project: |
BIOENGINEERING LABORATORY-PHASE I and II |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423/Dr. Louis Stodieck (303) 492-1005 |
| |
Description: |
1600 SF remodel into research labs for animal study. Included extensive lab casework and fume hoods. |
| |
Budget/Schedule: |
$94,000/Completed May 1991. |
| |
General Contractor: |
Valle del Rio Company Inc. |
|
Project: |
BEAR CREEK ELEMENTARY SCHOOL |
| |
Client: |
Boulder Valley School District RE-2 |
| |
|
P.O. Box 9011 Boulder, CO 80301 |
| |
Client Rep: |
Principal Sandra Brodie |
| |
Description: |
Developed conceptual plans for playground improvement. Coordinated with SAT to obtain financial schemes. Developed renovation schemes for library and media center. |
| |
Budget/Schedule: |
$35,000/Completed 1991. |
| |
General Contractor: |
BVSD personnel |
|
Project: |
CADD LAB - Stephen D. Bechtel Jr. |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423/Dr. Luis H. Summers (303) 492-1094 |
| |
Description: |
2,100 SF remodel into Computer Aided Drafting Design. Teaching laboratory including custom-designed furniture and command center. |
| |
Budget/Schedule: |
$240,000/Completed September 1991. |
| |
General Contractor: |
Sun Construction Services, Inc. |
|
Project: |
OCSC LABORATORY |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423/Dr. Christina Johnson (303) 492-1835 |
| |
Description: |
2400 SF remodel into water-cooled laser labs, including support office and research spaces. |
| |
Budget/Schedule: |
$65,000/Completed November 1991. |
| |
General Contractor: |
J.C. Brooks and Co. Inc. |
|
Project: |
RL2-HANDICAPPED ACCESSIBILITY |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Donald Milkovich (303) 492-4221/Ms. Sally Bries (303) 492-6883 |
| |
Description: |
1,000 SF upgrading/refinishing toilet room and public facilities to provide access to physically handicapped. |
| |
Budget/Schedule: |
$66,500/Completed May 1990. |
| |
General Contractor: |
Sun Construction Services Inc. |
|
Project: |
CHEMICAL ENGINEERING ADDITION |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423/Dr. Klaus Timmerhaus (303) 492-7680 |
| |
Description: |
5,500 SF addition of new floor within existing 2 story space. New offices and Lab remodeling. Fire and building code updates. |
| |
Budget/Schedule: |
$400,000/Completed January 1990. |
| |
General Contractor: |
Taylor Ball of Colorado, Inc. (Ringland/Johnson/Crowley Inc.) |
|
Project: |
MIMICAD RENOVATION |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423/Dr. David Chang (303) 492-6702 |
| |
Description: |
3,500 SF remodel to under-utilized space to include new faculty offices, student research areas, and administrative offices. |
| |
Budget/Schedule: |
$25,000/Completed May 1990. |
| |
General Contractor: |
Barba and Sons Inc. |
|
Project: |
PUMPHOUSES FOR CAMPUS IRRIGATION SYSTEM |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Donald Milkovich (303) 492-4221/Mr. John Masden (303) 492-5511 |
| |
Description: |
Two 400 SF buildings containing pumping systems for the entire Boulder Campus. Varsity pond building designed in context to its historic location.. |
| |
Budget/Schedule: |
$50,000/Completed July 1990. |
| |
General Contractor: |
Fagre Construction Inc. |
|
Project: |
BUSINESS SCHOOL EXPANSION |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. William Deno AIA (303) 492-5682/Dean Edward Johnson |
| |
Description: |
Development of conceptual design program plans for 50,000 SF classroom/lecture faculty offices building/Review expansion alternatives for existing Business School. |
| |
Budget/Schedule: |
Conceptual Design completed 1990. |
|
Project: |
GROWTH CHAMBERS - RAMALEY BUILDING |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Ms. Kris Hedberg (303) 492-4221/Mr. Russ Monson (303) 492-6319 |
| |
Description: |
700 SF of biology-related controlled environment rooms on an existing roof structure; 3,600 SF of fire code upgrades. |
| |
Budget/Schedule: |
$166,000/Completed August 1990. |
| |
General Contractor: |
Sun Construction and Design Services Inc. |
|
Project: |
CHEMISTRY 206, 207 AND 208 - MCKAY LAB/PC LAB |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423/Ms. Pamela Swindler (303) 492-5067 |
| |
Description: |
800 SF remodel for x-ray/research laboratory to include coding/x-ray machines, operable wall and separate PC lab. |
| |
Budget/Schedule: |
$80,000/Completed February 1989. |
| |
General Contractor: |
Sun Construction Services Inc. |
|
Project: |
STEM/METROLOGY LABS - EE00-051 |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423/Mr. Robert Kinne (303) 492-3330 |
| |
Description: |
2,000 SF remodel to include a "clean room" for an electron microscope and a laser metrology laboratory |
| |
Budget/Schedule: |
$250,000/Completed May 1989. |
| |
General Contractor: |
KCI Construction Inc. |
|
Project: |
MASS MEDIA PROJECT |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Donald Milkovich (303) 492-4221/Mr. Steve Jones (303) 492-8919 |
| |
Description: |
3,300 SF on 4th floor Norlin Library, remodel into office/
conference and presentation space for Journalism Dept.
|
| |
Budget/Schedule: |
$100,000/Completed January 1989. |
| |
General Contractor: |
Taylor Ball of Colorado, Inc. (Ringland/Johnson/Crowley Inc.) |
|
Project: |
MCDB LABS/LIFE SCIENCES BUILDING |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Donald Milkovich (303) 492-4221/Dr. Larry Gold (303) 492-7864 |
| |
Description: |
2,400 SF upgrading and remodeling of science laboratory to include benches, casework, office and waiting area, utilities. |
| |
Budget/Schedule: |
$80,000/Completed June 1989. |
| |
General Contractor: |
Sun Construction Services Inc. |
|
Project: |
RL4 - JOHNSON LAB |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Donald Milkovich (303) 492-4221/Mr. Tom Johnson (303) 492-4221 |
| |
Description: |
2,400 SF remodel for genetics research to include constant temperature room, fume hood, benches and casework. |
| |
Budget/Schedule: |
$84,500/Completed August 1988. |
| |
General Contractor: |
Sun Construction Services Inc. |
|
Project: |
ENGINEERING ADMINISTRATION OFFICES |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423/Dean Richard Seebass (303) 494-5071 |
| |
Description: |
1,500 SF remodel for conference/multi purpose presentation room with operable walls, storage and handicap bathroom. |
| |
Budget/Schedule: |
$25,000/Completed September 1988. |
| |
General Contractor: |
Sun Construction Services Inc. |
|
Project: |
COMPUTER CENTER |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. Robert Stolte (303) 492-1423 |
| |
Description: |
2200 S.F. remodel to include new facilities for Personal Computer classrooms, adjacent support spaces and lounge. |
| |
Budget/Schedule: |
$42,500/Completed October 1988. |
| |
General Contractor: |
Sun Construction Services Inc. |
|
Project: |
CHEMISTRY 328 & 329 |
| |
Client: |
The Regents of the University of Colorado |
| |
|
Facilities Management Boulder, CO 80309-0053 |
| |
Client Rep: |
Mr. David Long (303) 492-4221/Ms. Pam Swindler (303) 492-3280 |
| |
Description: |
1,200 SF remodel fragmented lab space into chemistry research lab including cabinetry, fume hoods, eyewashes and fire protection systems. |
| |
Budget/Schedule: |
$70,000/Completed October 1987. |
| |
General Contractor: |
PCL Construction Services Inc. |
|